<< Back to list of methods

CONCRETE FLOOR RESURFACING

For large scale factory floor resurfacing and external hard standings

METHOD

  • Remove all loose, unsound concrete and contamination by shotblasting (blastracking) the surface to ensuring that the concrete substrate is strong and open textured.
  • Depending on the product to be used either:
    a) saturate the concrete with water and after soaking remove any free surface water. Whilst the concrete is still damp mix the smoothing compound and scrub it into the surface with a stiff broom.
    b) Apply two coats of primer to the dry substrate.
  • Mix and pump the resurfacing compound over the area to the required thickness.
  • Release trapped air and assist in levelling with a spiked roller.
  • Allow to harden and traffic
  •  

    MATERIALS

    Internal/External -
    Febflor HD

    Internal only -
    Ultralevel IT HD TOP
    with primer Ultraprime AR

    Click on product name for data and full application instructions

    << Back to list of methods



    Home   ::   How to Repair Industrial Concrete Floors Manual
    Self-levelling and Pumpable Screeds   ::   Chewing Gum Repellent and Block Paving Protection
    Anti-slip Floor Paints and Hygienic Coatings   ::   Fast Set Floor Repair Mortars   ::   Why use epoxy resin grouts
    Epoxy and Polyurethane Resin Screeds and Seamless Floors   ::   Basement Waterproof Paints and Treatments
    Fast Setting Highway, Motorway and Road Repair Products   ::   Concrete Repair Mortars   ::   European Standard EN 1504

     

     

    INDUSTRIAL MAINTENANCE & CONSTRUCTION PRODUCTS

    CONSULTANCY, SERVICE & SUPPLY
    CALL NOW!
    Tel: 01925 852225